1.
Water & Power Development Authority
  • Installation, Testing & Commissioning of Re-heater Tube Elements of Boiler for 250 MW Init No. 1, TPS, Jamshoro.
  • Erection, installation, testing and commissioning of make-up water system & laying of lines upto 1200 mm dia for cooling towers and chemical treatment plant, for unit No. 01 & 02 (2 x 110 MW) at Thermal Power Station, Guddu.
    Client: M/s SKODA, Czeck.
  • Laying of M. S.  Pipe   30" dia, 6,000 M from Power Station to River Indus and installation of pumping system for (880MW) Oil fired Thermal Power Station, Jamshoro.
    Client: RE, TPS Jamashoro / WAPDA
  • Supply, Erection & lying of make-up water piping system of  (880 MW) Oil fired Thermal Power Station, Jamshoro, Pakistan.
    Client: RE, TPS Jamashoro / WAPDA
  • Supply, installation and laying of low pressure pipe line of 18" ø for water disposal system for unit No.: 1, 2, 3 & 4 (880 mw) Oil Fired Thermal Power Station, Jamshoro,
    Client: RE, TPS Jamashoro / WAPDA
  • Supply, installation, testing and commissioning of fire protection system, 450MW (General Electric) Combined cycle project. This includes the supply, installation of Fire equipments, Pumping system, lying of Pipelines of various sizes, etc. Guddu, Kashmore, Pakistan.
    Client: PD, WAPDA  Consultant: Gibbs & Hills Inc, USA
  • Supply, laying of water, sewerage and gas pipeline of various sizes for residential units 1020 Nos. of different categories at Thermal Power Station, Guddu, Pakistan.
    Client: PD, Guddu / WAPDA
  • Construction and arrangements for disposal sewerage system and providing, installation of    pumping system at Thermal Power Station, Guddu.
    Client: SE(C), Guddu / WAPDA
  • HP pipeline for gas and oil for boiler 210 x 1 unit Thermal Power Station, Guddu, Pakistan.
  • Supply, installation & laying of pipelines erection, testing and commissioning of 02 Nos. HSD Oil Tanks for 450 MW combined cycle project, Guddu, Pakistan.
  • Laying of fire fitting pipeline 8"-12"ø for 880 MW, Thermal Power Station, Jamshoro, Pakistan.
  • Supply laying of gas pipeline for main power station 12” dia for Thermal Power Station, Guddu, Kashomore, Pakistan
  • Providing & laying of High pressure steam pipeline for unit No.1, 2, 3 & 4 (880 MW) Oil fired Thermal Power Station, Jamshoro, Pakistan.
  • HP pipeline for gas and oil for boiler 12.50MW x 4 units at Thermal Power Station, Sukkur
  • Providing, installation and lying of Sui Gas pipe line for Housing project at Thermal Power Station, Guddu.
  • Supply, installation fuel oil decanting system for Thermal Power Station, Guddu, Kashmore, Pakistan
  • Installation and modification of gas station with piping for 880MW oil fired Thermal Power Station, Jamshoro, Pakistan
  • Laying of pipeline on EPC basis for 310 MW makeup water Chinese Unit at Thermal Power Station, Muzaffargarh.
2.
Pakistan State Oil Company Limited (PSO)
  • Laying and commissioning of 42” dia. Pipeline & installation of pumps at Zulifiqarbad Terminal, Port Qasim, Karachi.
  • Laying / commissioning of 24”dia Pipeline between main railway line and Gandhara Nissan Factory connecting FOTCO Jetty with Zulfiqarabad Oil Terminal, Pakistan.
  • Construction of Horizontal Tank and Pipeline system at Juglot Depot.
  • Erection / commissioning of Pipeline of 16” dia. for supply of furnace oil to AES Power Complex
  • Erection / commissioning of MS & SS Pipelines at (OP-V) Terminal for fuel and chemical at Karachi Port Trust, Keamari, Pakistan.
  • Supply, installation, laying and commissioning of S.S. and C.S. piping at jet fuel farm facilities at new Lahore International Airport.
  • Erection / commissioning of Process Piping, Installation / testing of Pumps for PSO Revamp Project for Lube Oil Facilities at Korangi, near NRL Refinery, Karachi.
3.
Asia Petroleum Limited, Karachi.
 Hub River Fuel Oil Pipe Line Project for 40” dia. at PSO Zulfiqarabad Oil Terminal Pipri.
4.
Pakistan Refinery Limited
Foam Concentrate Distribution System at PRL, Keamari
5.

PARCO - Pak Arab Refinery Co. Ltd.

Contractor:

Samsung Heavy Industries
Laying of pipeline of various dia for pumping station of Mid Country Refinery Project at Keamari & Korangi Terminal, Karachi – Pakistan
6.
Fauji Oil Terminal & Distribution Company Limited.
Laying of pipeline 36” dia for FOTCO Terminal at Port Qasim, Karachi, Pakistan.
7.
China National Machinery Import & Export Corporation, China

Erection and Laying of Pipe line including structure of 30” Dia, 9.2 Kilometer for Make-up water arrangements for Thermal Power Station, Muzaffargarh, Pakistan.

8.

ENAR Petrotech Services.

Construction Of Semi Buried Storage Tanks & Associated Piping Works for Condensate Processing Refinery Facility at Korangi Karachi
9.
Oil And Gas Development Co. Ltd., (OGDCL) HMC.

Fabrication and Erection / installation of gas pipeline at Qadir Pur gas field.

10.
Pak Suzuki Motor Company Limited.
Conversion of ABT Piping, Installation of S.S lining for Tank and modification work for conversion from AED to CED system at Paint shop & Inspection room for vendorised local parts.
11.

Engro Vopak Terminal, Limited.

Construction of 10” dia S.S. Pipeline for Phosphoric Acid Pipeline at Port Qasim.

Construction of S.S. Pipeline for MEG at Engro Vopak Tank Terminal, Port Qasim, Karachi

12.
Engro Chemical Pakistan Limited.

Construction of S.S. and C.S. Process piping for Environment Improvement Project at Engro Chemical Pakistan Ltd – Dharki. Job includes: Piling, Foundation & Rip-Rap work at Mahi Wah Canal

13.
Preussage Noelle, Germany.
Process piping 8”dia. Stainless Steel (3000M) from Jetty to station for Pak Tank Terminal of Engro project at Port Qasim, Karachi, Pakistan
14.
WAPDA / KAPCO.
Design, Supply & Installation of Fuel Oil Piping at Gas Turbine Power Station, Kot-Addu, Pakistan.
15.

Technopromexport Moscow, Russia.

Erection of Main Boiler, Desecrator bay, High and Low pressure pipe line Fabrication & Erection of Air  & Gas ducts Installation of ID, FD Fan, Equipment, Auxiliary Structure for unit No. 1, 2 & 3  (3 x 210 MW) Thermal Power Station Muzaffargarh, Pakistan. 

Erection, laying of HP, LP process piping for Boiler auxiliary, CW piping, makeup water line for 210 MW x 3 unit, Thermal Power Station, Muzaffargarh, Pakistan.
16.
BOC Pakistan Limited.
Construction of Carbon dioxide Pipeline for Carbon dioxide Plant at PFL, Multan.
17.

Hanover Company U.S.A.

Cryogenic LPG Recovery Plant Jamshoro, complete Erection / Installation and Commissioning, at Jamshoro Joint Venture Limited (JJVL).

Mechanical Installation and Testing of Piping Works at (JJVL.).

Supply, Laying and Jointing of R.C.C Pipe 24" dia for Water Channel
18.
Shell Pakistan Ltd
Supply, Installation and Commissioning of 8”& 16” Dia. Tanker Discharge Line at Keamari, Karachi.
19.

Karachi Water & Sewerage Board
Main Contractor

KSB Pumps
Construction of Pumping Station, Piping Work (Dia. 3.8 meter), Karachi Bulk Water Supply Scheme Phase-V, Stage II, 2nd 100 MGD K-III Project.
20.

SHYDO

(HMC Taxila)

Supply of Material, Fabrication, Erection and Testing of PENSTOCK (Dia. 4.0 meter, Length 732 meter) at Dargai, for Malakand – III 86.0 MW Hydropower Project.

21.
BYCO Pakistan Limited
Civil, Mechanical and E&I Works For Crude & Products Storage & Blending System Revamp Piping, for BYCO Pakistan Limited and Fire Fighting System Network = 40, 000 Dia Inch.Civil, Mechanical and E&I Works For Crude & Products Storage & Blending System Revamp Piping, for BYCO Pakistan Limited and Fire Fighting System Network = 40, 000 Dia Inch.
22.
FWQ Enterprises (Pvt.) Ltd.

Contract for Mechanical, Electrical & other related works for FWQ Liquid Cargo Terminal at Port Qasim.

23.
LUB Gas (Pvt.) Ltd.

Engineering, Procurement & Construction Work including Testing & Commissioning of LUB Gas LPG Station and Allied Piping for following Stations in Lahore:

  • Ferozepur Road Shami Park-1
  • Sukhainabad, Ferozepur Road
24.
FWQ Enterprises (Pvt.) Ltd.
Supply and Installation of 8” Dia. & Capacity of 1200 M3 , Stainless Steel Product Pipeline from Edible Oil Jetty to Station = 1200 Dia. Inch.
25.

BYCO Oil Pakistan Limited

(BOPL)

Fabrication & Assembling of Furnace:

  • Having 7.6 Φ x 16.450 Height & Capacity of 750 M3